|
||||
![]() |
Corgan Architecture ![]() WAI-WIZE was contracted to design a new low voltage cabling system. This new low voltage system was designed to support all voice and data needs at DCCCD’s newly renovated headquarter facilities. Specifically, this new design incorporated CAT6 cabling to each office, a riser cable design and a wireless access point design. Back to clients |
|||